Cathedral Spire Restoration: The End is in Sight

As Montreal’s first Anglican community, Christ Church Cathedral has been lifting up the cross of Christ since its inception. The Cathedral building, on the other hand, has not been without architectural issues, and has faced many challenges in holding up its spire cross. The original stone spire, built in the 1850s, weighed nearly 1.6 million kilograms––about as heavy as 150 school buses. By the 1920s, the Cathedral’s spire leaned more than a metre to the south. To save the building from collapse, the original spire was taken down in 1927 and replaced in 1940 with a much lighter steel and aluminum version.

However, a chemical reaction between the steel and aluminum tiles corroded the frame over time, and in 2016, the Cathedral’s spire was at risk of collapsing into the building. We had to act fast––to save the building, and to ensure the safety of the public––so we got to work right away.

We are pleased to announce that we have finally reached the last stage of the project. On May 19th 2022, the Cathedral’s cross was reinstalled atop the spire. Together with Rector’s Warden Sheena Gourlay, Dean Bertrand Olivier braved his fear of heights and climbed 70 metres to the top of the spire to rededicate and bless the cross as a symbol of Christ’s abiding presence in the heart of downtown Montreal. This event, two years after the cross had been taken down, launched the final phase of the project: replacing the aluminum tiles on the spire’s roof and taking down the scaffolding that has surrounded the building since 2017.

 

 

 

 

Continue reading “Cathedral Spire Restoration: The End is in Sight”

Phase 1 completed, Phase 2 contract signed

On behalf of the members of the Major Fundraising Campaign Cabinet, and all our volunteers, we would like to thank you for your continued interest for Christ Church Cathedral and the Rising Up! Campaign for our new spire.

By way of an update, our construction is coming along.  Started in early 2017, Phase 1 preparatory work, which included significant repairs of the tower masonry, is now complete.  Parks Canada and Quebec Religious Heritage both contributed to this Phase.

Continue reading “Phase 1 completed, Phase 2 contract signed”

What is under that scaffolding? An update on the Capital Campaign

The Very Reverend Bertrand Olivier

Just over a year ago, I arrived in Montreal to take up the post of Rector of Christ Church Cathedral and Dean of Montreal. I knew that that was going to involve a lot of rolling up of sleeves, and in that I was neither surprised nor disappointed. On my first morning, I was greeted by the now very familiar green Capital Campaign banners above our St Catherine Street entrance, and scaffolding slowly being erected around our tower. Many construction and campaign cabinet meetings later, here we are early 2019 with scaffolding still present, and the tower wrapped in a gigantic scarf like white tarpaulin. Yet, there is currently not a great deal of activity on the site. So, what is happening at Christ Church Cathedral, your cathedral and the mother church of the Diocese of Montreal? Continue reading “What is under that scaffolding? An update on the Capital Campaign”